Jamaica Cottage Shop plans, adapted for store-bought lumber + cedar shingles over plywood Β· page refs are to the plans PDF Β· check off steps as you go
Update β September 30, 2026: the roof plan changed. Phase 4 is now 3-tab asphalt shingles over a solid sanded-plywood deck, not corrugated metal over cedar strapping. Full plan, order list and decision history: Roof Phase Order.
Framing: KD pine 2Γ6 rafters (not spruce); 2Γ8 #2 Prime KD SYP ridge board (not cedar 1Γ8), cut 143-13/16β³, with Simpson RR-R connectors on the 10 interior rafters (14 were bought; the 4 extra RR-R are to be returned) and A35Z at the 4 ridge ends (the RR-R does not fit there); Simpson H2.5AZ Γ10 at the interior seats and A35Z Γ4 at the end seats (8 A35Z in all: 4 on hand, 4 to be bought Oct 2); all connectors fastened with Simpson SD9112 #9Γ1-1/2β³ screws, no hand-nailed connectors (need β 276: RR-R 10Γ8, A35Z 8Γ12, H2.5AZ 10Γ10; 3 boxes on hand + 1 box Oct 2).
Collar ties: cedar 1Γ6, Grip-Rite 2β³ 13-ga stainless, 7 per end.
Deck: 19/32 sanded BCX, B face down (the ceiling); clips at the course seam; 3β³ ring gun nails at 4β³/6β³.
Dry-in: ProArmor with Stinger cap staples.
Shingles: GAF Royal Sovereign 3-tab, Weathered Gray; 3/4β³ coil nails, 6 per shingle; cut starter and ridge caps; Loctite at the rakes; Union black drip edge.
Trim: cedar fascia + shadow board, shadow board flush with the fascia top (departure from JCS p.30; see Roof_Phase_Order.html). At the eaves both tops sit ~2-1/2β³ above the plate (open: raise the fascia ~7/8β³); at the rakes they sit tight under the deck.
Tools: one Freeman G2CN45 coil roofing nailer for the roof and the cedar wall shingles.
Superseded Phase 4 steps are marked, not removed.
Status β October 1, 2026:
All 14 rafters are cut; one is a miscut and its replacement 2Γ6Γ12 is being bought Oct 2.
The test pair was fitted. The ridge is cut to 143-13/16β³ with its RR-R connectors attached. A35Z angles are installed at the 4 corner seats.
Raising is planned for Oct 2.
Exterior wall sheathing is finished on all walls. The deck plywood (7 sheets of 19/32 sanded BCX) was cancelled by Lowe's; re-ordered from Home Depot, delivered Oct 2.
Building: 10x12 gable shed (JCS plans) Β· post-and-beam PT frame Β· 77Β½" walls (as-built) Β· 6/12 roof Β· corrugated metal roofing3-tab asphalt over a sanded-plywood deck (Sep 30, 2026) Β· cedar shingles over 15/32 Plytanium sheathing + #30 organic felt (housewrap superseded) Β· cedar trim Β· shop-built pine double doors (RO 62Β½"Γ73") Β· two salvage barn sash windows, west wall β RO 34" Γ 19β " as-built (sash 33.5"Γ19.125" + the plans' Β½"; the plans' 24Β½"Γ24Β½" is superseded)
Site: pad benched into the lot's high corner; fence wraps the east and north sides (~1 ft off the east wall); door wall faces south, windows on the west wall; neighbor to the south sits slightly uphill β drainage handled by a below-subgrade collector piped to daylight downhill
Orders: the original plan was three Lowe's deliveries batched by phase (pre-switch; under review in the Cost Ledger). The roof now runs on the Sep 30 re-order (Lowe's #β¦392512, delivered Oct 1 except the plywood, which Lowe's cancelled; re-ordered from Home Depot, delivered Oct 2), with a short Oct 2 purchase β see Shed_Orders.html
Safe Pause Points
Life happens β these are the three states where the project can sit indefinitely without harm:
β Finished deck (end of Phase 2) β PT + CDX is weather-tolerant
β Dry-in (Phase 4, after the ProArmor step of the current plan) β deck + ProArmor on. The wall felt comes later
β Done (end of Phase 5)
The three build-ruining mistakes this guide exists to prevent: β pre-cutting infill pieces from the printed cut list (they're wrong for store lumber β see Lumber Rules tab), β‘ building walls on an unlevel deck (p.25: nothing above will be true), β’ batch-cutting rafters without a test pair.
Nail Gun Map
Framing nailer (Freeman PFR2190): all floor/wall/roof framing β 3"Γ.120 ring shank HDG, 21Β° plastic FRH, with the +1 rule at primary joints (decided July 2026; ring beats 16d common on withdrawal, extra nail erases the shear delta) β plus floor ply and wall sheathing with 2"Γ.113 HDG ring stock. roof strapping(Superseded Sep 30, 2026: there is no roof strapping. The roof deck uses the 3"Γ.120 ring stock at 4β³/6β³ into rafters only.) Sequential trigger for toenails. Hand-drive loose 16d HDG smooth at: plate-to-post laps, visible blind-nail faces. Fascia/shadow = 10d stainless ring.(Superseded: fascia and shadow boards are fastened with CAMO #8 Γ 3-1/2β³ 316 stainless screws.)
Coil siding nailer (not yet owned β Phase 5 decision): the cedar shingles only now (stainless ring-shank coils). Buy ~$150 or rent for shingle week. Shingle depth setting: flush, never sunk; test on scrap. Superseded Sep 30, 2026: a Freeman G2CN45 coil roofing nailer replaces it β 3/4β³ nails for the asphalt roof, and 1ΒΌβ1Β½β³ stainless ring-shank coil roofing nails for the cedar wall shingles later (final length open; CSSB: stainless, β₯1ΒΌβ³, concealed in single-course walls). Freeman G2CN45 and BHTOP 3/4β³ 15Β° smooth coil nails: to be ordered or confirmed.
Stinger CH38-2 cap stapler (1β³ caps, 3/8β³ staples; bought Sep 30): ProArmor now, and the #30 wall felt later. Collar ties: Grip-Rite PrimeGuard Max 2β³ 13-ga 304 stainless ring nails, hand-driven, pre-drilled near the ends. Connectors: SD9112 screws, never nails.
15ga finish nailer (stainless): ALL cedar trim (corner boards, window/door casing, jamb) + window/door stops, sash-lite stops β stainless because it's cedar (Rule 2); hand-nail stainless at board ends.
Housewrap: hand-drive cap nails (~$12) β no cap stapler in the inventory.(Superseded: the wall barrier is #30 felt, fastened with the Stinger CH38-2 cap stapler; no seam tape.) Sash-lite stops: 18ga stainless brads in the PBR32Q.
Hand-nail: fascia + shadow board (10d/3" stainless ring, ~80 nails).(Superseded: fascia + shadow board go on with CAMO #8 Γ 3-1/2β³ 316 stainless screws.)
Screws only: doors, hinges, hardware, trim (CAMO), connectors (SD9112).
Cautions: stay 1" off cedar/pine board ends; don't overdrive ply face veneer (kills shear); dial depth on every material change.
Project Files
PLANS.GBL.10X12.SHELL.pdf β the plans (page refs throughout this guide)
Annotated_Plans.html β all 49 plan pages rendered with 155 tagged annotations (the page refs above link conceptually here; ~15 MB, loads slow)
Plans p.16, 19, Appendix C Β· Materials: Order 1 Β· ~1β2 days
Trench before gravel. The collector trench sits 3β4" below the pad subgrade β dig it while the excavation is still open and the gravel is thin.
Collector trench (as-decided) β south toe only: start just west of the conduit penetration through the south course, run west to the SW corner (~10β11', straight, no turns). 3β4" below pad subgrade, falling β βΒΌ"/ft toward SW (1Β½β3" total). Fabric-line, 4" perforated pipe holes down, upstream end capped, #57 surround, fold fabric over (burrito). Starting west of the conduit means the drain and conduit never cross. Rest of the pad (incl. NE deep corner) drains to it through the gravel β bathtub principle; the geotextile base keeps that path clean. At the root: wrap clean stone generously over and around it β no cutting, nothing bearing on it.
Discharge leg: transition to solid 4" pipe at the SW lip β the lowest corner β turning with paired 45s (no hard 90s, keeps the line snake-able from the outlet), glue the solid-run joints, and run downhill until ground surface drops below the pipe invert (measure this with the laser before buying stick count). Terminus: 3" pop-up emitter (July 2026 decision β invisible in the lawn; needs 6"+ total fall to the emitter, weep hole drilled in the elbow over ~6" of #57 sump for mosquito/standing-water control; emitter lifts off for snaking) β or the NDS grate already owned if the end grade turns out too flat for a pop-up. Bucket-test before burying: water in at the NE corner of the pad, out at the emitter in seconds β proves the gravel path across the root and the pipe in one shot.
Bury conduit while ground is open β approach from the front (house side; avoids the oak root entirely). Stub location (as-built 7/21/26, from the chalked 120"Γ144" building outline): 7" in from the outside face of the east (fence-side, windowless) 12' wall, 8" from the outside face of the south (door) 10' wall β the SE corner (see diagram below), in the clear rim-to-skid channel, first joist bay, clear of the block station, snug to the corner post; devices later mount on the door-flank wall (switch by the door) with no angle braces to dodge. Long-sweep 90Β° at the bottom, riser standing 18β20" above the pad (floor top β14"), cap taped, pull string in. Size: 2" conduit (as-built) β a single 20A circuit only needs Β½βΒΎ", but 2" keeps any future feeder pullable, up to and beyond a 60A subpanel (one circuit needs no subpanel; a second circuit ever means feeder + subpanel + ground rod, NEC). Note: low-voltage can't share a raceway with power conductors (NEC Class 2 separation) β it would need its own sleeve. This is a future-proofing sleeve only β a short run (~5β6') from just outside the south perimeter (east of the future ramp) to the stub, not a run to the house. Hold the horizontal at ~12β18" below pad subgrade; long-sweep 90 up at the stub is the only vertical transition inside. Drain crossing: none β the collector starts west of the conduit penetration, so the two systems never intersect. Outside end: terminate ~18" below yard grade (where a future house trench will meet it), glue a cap, and mark it three ways β tape-measure photo off the fence/edging corners, a buried physical marker directly above, a note in the project folder. Conduit goes in FIRST, drain trench dug over it. Verify gray electrical conduit, not white plumbing PVC (only gray is a listed raceway). Photograph the run with a tape in frame before covering; paint-mark the edging where it crosses.
Screw in the 4 ground anchors β must precede gravel (augers can't thread through stone). Vertical, into the clay subgrade, just inboard of the future skid lines ~12β24" from each skid end; eye finishing just above subgrade. Keep-clears: 24"+ from the SE conduit stub + its southward sweep; north of the S-toe trench line; 18"+ from every block station; clear of the root. Coil + tape each cable tail proud of future gravel. Fabric later gets a small X cut over each. (Bar through the eye for leverage; damp clay turns far easier.)
Finish the 4x6 edging courses.
Non-woven geotextile over the clay floor before remaining gravel β separation keeps clay from fouling the base (the unmaintainable layer the drainage depends on). Overlap seams 12"+, lap over the trench burrito edges, tack a skirt to the inside of the N/E timber wall (which now retains the old clay cut faces) to just below finished gravel β hang the skirt first, then lap floor strips over its bottom edge so everything sheds downward. Lay loose over the root. Where gravel is already compacted, leave it β but prioritize fabric under the six block stations and the east-face-to-collector path. Then gravel in ~2" lifts, compacting each lift (plate compactor). Screed the top flat.
Laser method (all Phase 1 tasks): tripod on firm ground OUTSIDE the work zone; self-level; plane 12β24" above future block tops. Measure DOWN from the plane with one stick, same end down all session β same reading = same elevation; deeper = bigger reading. Set a benchmark first: screw in a fence post, read it, write the number on the wood β after any tripod bump or multi-day gap, re-read the benchmark to convert old numbers. Daylight: use the detector if the laser has one; a bare line laser needs dawn/dusk/overcast or a ~$40 receiver. Trench fall = reading grows β βΒΌ"/ft toward SW; emitter spot reads 6"+ more than the SW lip.
Laser-check the pad. Stick readings on a ~3' grid after each compacted lift; rake + re-tamp anything >Β½" off. Don't chase perfection here β precision lives at the block tops.
Set 6 solid blocks (coordinates in the table below; 16" dimension across the skid; middles shifted off the root line): set one corner block first β tamp and twist it to full bearing, read its top: that reading is the master number. Place every other block, read, and re-seat (add/scrape gravel, tamp, twist) until its top matches the master β within β " is excellent, shims perfect the rest at deck time.
Termite shields on each block: flashing square extending ~2", edges bent down 45Β° (Appendix C).
Stub lands at the southeast corner β as-built 7" from the east (fence-side) wall, 8" from the south (door) wall β in the clear channel between the rim (1Β½") and the skid, nearly dead-center of the first joist bay. Nothing in the floor system touches it, but the skid side is the tight one (~2" edge-to-face): drill the floor hole directly over the stub β all the slack is toward the rim.
All from the inside faces of the timber walls at gravel height (as-built interior 142Β½" EβW Γ 166Β½" NβS; building outline margins 11ΒΌ" all around). Layout method: stretch the two skid strings at ~24ΒΌ" off each side wall first; everything references them. Skids are 4x6 laid FLAT β 5Β½" wide Γ 3Β½" tall. Skid spacing: outside face to outside face 99Β½", inside face to inside face 88Β½" (94" center-to-center β the plans' value; Β±Β½" is fine, the deck squares itself in Phase 2). Always check both edge measures, never the centerline β they differ by exactly twice the member width, so if they disagree the member isn't the size you think it is. Priority of precision: β block tops in one laser plane β‘ trench fall β’ blocks centered under strings (Β±1") β£ everything else.
Object
From side wall
From SOUTH wall
Notes
Conduit stub (2" riser center)
18ΒΌ" from EAST
19ΒΌ"
AS-BUILT 7/21/26 (planned 17ΒΌ"/20ΒΌ"). All clearances verified against the corrected 5Β½" skid: rim 4ΒΌ" Β· skid face ~2" Β· end joist 5ΒΌ" Β· next joist 6" Β· block station 1 ~4.8". Nearly dead-center of the first joist bay. β Slack is all on the east side β at flooring, drill the ply hole directly over the stub, don't center it in the rim-to-skid channel. Cap taped, not glued
Blocks β 6 total, 3 per skid, PAIRED (both skids identical). 16" dimension ACROSS the skid, 8" along it. The along-skid measure is the arbiter; x,y is layout only. Cross-pad at every station: outside edge to outside edge 109β " Β· inside edge to inside edge 78β " (109β β 78β = 31ΒΌ = twice the block's actual 15β " face β if that doesn't hold, a block is turned wrong). If a block is ever re-set 8"-across: 101β " / 86β ". (Corrected Aug 13, 2026 β the old 110"/78" pair assumed a nominal 16" block; the real blocks are CMU-modular at 15β ", and laying to 110" put the skids β " too wide in the field.)
Station 1 (south)
~24ΒΌ" from EAST / WEST
~29ΒΌ"
18" from the skid S end (edges 14"β22"). ~4.8" clear of the as-built stub. Cantilever 18" β see Base & Deck Construction for why it is not 12"
Station 2 (middle)
~24ΒΌ" from EAST / WEST
~84ΒΌ"
73" from the skid S end (edges 69"β77"). β NORTH of the oak root, not south β the old "shift to 66β70" note left a 73" span. This is the one field variable: center the root in the gap below this block, min 6" from each measured root edge. Record the root's actual N and S extents when exposed
Station 3 (north)
~24ΒΌ" from EAST / WEST
~139ΒΌ"
128" from the skid S end (edges 124"β132") = 16" from the skid N end. Tops lasered to one plane
Spans between stations
55" and 55" β clear gap 47" each, and equal gaps is the one-tape check
Cantilevers 18" south, 16" north. A 5Β½"Γ3Β½" flat SYP skid has ~30% less section than the plans' full-dimension hemlock, so longer cantilevers buy the shorter spans we need. Full derivation: Base & Deck Construction
Anchors β SE / SW
29" from EAST / WEST
52"
β With the corrected 5Β½" skid, the anchors land only ~2" inboard of the skid's inside face (not the 4ΒΌ" previously recorded). Workable β the cable rises alongside and over the top, and the steeper angle puts more tension straight down. Before setting skids, measure all four eyes off the side walls: any eye at 27" or less ends up UNDER the skid. Vertical; eye just above subgrade; tails coiled proud of gravel
Anchors β NE / NW
29" from EAST / WEST
115"
Collector trench
hugs SOUTH toe
starts just W of conduit penetration β SW corner
~mid-pad (~83"), meets E wall ~halfway β MEASURE AND RECORD the actual N and S edges
nothing bears on it; clean-stone bridge over. Clearance rule is 6" from each root EDGE (not from a centerline) to the nearest block edge β enough for load spread through the gravel. The old 12" figure was a growth allowance; the tree has <10 years left, so growth isn't the governing concern
Phase 2 β Floor
Plans p.16, 20β21 Β· Materials: Order 1 Β· ~1β2 days Β· ends at a safe pause point
Lumber rules in play: joists cut 117" (not the printed 116Β½") Β· blocking cut to fit β ~14Β½" middle bays, ~13ΒΎ" end bays Β· everything else printed lengths.
Skids: cut to 144"(Β±ΒΌ" β nothing mates to a skid end; the exact numbers are the frame's). Laid FLAT: 5Β½" wide Γ 3Β½" tall. 45Β° bevels down-and-out β 1Β½" down from the top, 45Β° out to the bottom (p.16 fig 3). Set on blocks: outside face to outside face 99Β½", inside face to inside face 88Β½", outer faces 10ΒΌ" in from where the deck edges will sit. Don't level yet.
Frame the deck on the skids: rims 144"; joists 117", crowns UP, at 16" o.c. β mark both rims together, clamped face-up on sawhorses with ends flush and the reference end labeled "S": hook the tape on S and mark 15ΒΌ" then every 16", squaring each line across both at once, with an X on the north side of every line. (15ΒΌ not 16 puts joist centers on 16/32/48/96, so ply seams land on a centerline. Marking the rims separately guarantees they disagree.) Four 3"Γ.120 ring gun nails per joist end through the rims (+1 rule: plans' three 16d, translated). Tack only at first.
LEVEL THE DECK NOW β jack + shims at the blocks (p.25 step 1). This is the checkpoint everything above depends on. Shims: NOT tapered carpenter's wedges (they crush, split and squeeze out; a taper bears on a line). Flat, non-tapered, rot-proof, full-bearing only: asphalt shingle scraps ~β " each, composite/plastic structural shims, or PT squares cut ~5Β½"Γ8". On top of the block, under the termite shield β the shield must touch the skid. More than ~Β½" of stack at any block = re-seat that block. Jack on a plywood pad, under the skid, never the rim. Paper test every station: slide a slip of paper into the gap between skid bottom and shim/block top — pinched = bearing, slides freely = shim it. Test both edges of each block; one edge bearing and the other free means the skid is rocking. A gap does not stay a gap: sustained load creeps at ~2× the instantaneous deflection. Flip-test your level (read, rotate end-for-end, re-read — the two must agree) and use the laser for whole-deck plane, not a 2-ft bubble walked down 12 ft.
Square: adjust until both diagonals read 187Β½" (p.21 β true value 187.44"; what matters is the two being equal to each other). Then nail off and toenail joists to skids: 2 per crossing, 40 total, framing gun on sequential trigger, one from each side, opposing β two from the same side walk the joist off its mark. Start ~1ΒΌ" up at ~45Β°; drive one, re-check the mark, drive the opposite. β Re-verify the skid positions (99Β½" outer / 88Β½" inner) before the first toenail β the skids sit on slick shields and this step freezes the geometry.
Connect the anchor cables (anchors already in from Phase 1): uncoil the 4 tails, cable over or lag-eyed to the skids, turnbuckles snug β not cranked (leave room to re-level someday).
Blocking rows on the chalk lines at 23ΒΌ" and 71ΒΌ" measured from the EAST rim's outside face. Each line marks the block's east face; the block sits WEST of the line, occupying 23ΒΌβ24ΒΎ" and 71ΒΌβ72ΒΎ" so the ply seams at 24" and 72" land centered with ΒΎ" of bearing per sheet. Use the east rim only β mixing reference edges is how these get transposed. As-built Aug 2026: ply columns run 24 / 48 / 48 from the east, so the ripped 24" strip column lands on the EAST and the conduit hole falls in the SE strip piece β a 24"-wide piece drops over a stub-up far more easily than a full 48Γ96 sheet. The layout is rotationally symmetric across the diagonal, so either side works; the east was chosen in the field. Each block cut to fit its bay, flush to joist tops. 3 nails per end — 3"×.120 HDG ring from the framing gun, not loose 16d (those are for the plate half-laps; 3 gun nails ≈ 2 true 16d under the +1 rule, which is fine here because the ply diaphragm carries the shear and this blocking is a seam backer). Two passes: odd bays first, end-nailed through the joist face (gun); then even bays, toenailed 3 per end into the block's vertical faces — never the top edge — 2 on one face, 1 on the other. Expect to hand-drive the toenails. Cut pass-2 blocks 1/16" scant so they don't push joists off 16" o.c. Block every bay — detail at Blocking, two-pass.
3/4" ply laid perpendicular to joists, staggered joints (p.21 fig 4 pattern), 2" Γ .113 HDG ring shank @ 6" edges / 12" field (the plans' 6d, translated β see Nail_Guns_and_Fasteners.html).
β Pause point β the bare deck can sit through any weather.
Phase 3 β Walls
Plans p.22β26 Β· Materials: Order 2 Β· ~1β2 days
Lumber rules in play: half-laps 3Β½" Γ 1ΒΎ" Β· hold the ROs by their inner faces/edges Β· all infill lengths from the conversion table (Lumber Rules tab), or measure in place.
Door decision (July 2026): shop-built plank doors per the plans, each with a fixed 6-light sash lite (see Phase 5). Frame the plans' standard 62Β½" Γ 73" RO β no changes in this phase. The sash hunt (salvage or 2 new 24Γ24 barn sash) can run in the background; nothing here waits on it.
West windows β current layout (Sep 2, 2026, field-confirmed): four full-height window studs (deck to plate) with centers at 25-3/4β³, 61-1/4β³, 82-5/8β³ and 118-1/8β³ from the south outside face. Each outer stud's brace-side edge is 21-1/2β³ from the adjacent corner post's inside face, so both outer studs clear the corner braces. Each clear RO is 34β³ wide, with a 19-7/8β³ clear center bay between the inner studs. Header and sill cut length is 34β³; the sill top and header bottom heights are pending the final sash height and sill-pan profile (see Wall_Framing.md). Full layout: Wall_Framing.html.
Superseded (Aug 25, 2026 coordinates): as-built ROs 22.84β³β56.84β³ and 87.03β³β121.03β³; window studs at 21.34β22.84 / 56.84β58.34 / 85.53β87.03 / 121.03β122.53, centers 22.09 / 57.59 / 86.28 / 121.78; the 3β³ shift; the north stud stopping at 71β³; and the derived gaps (17.8 / 11.8 / 11.8 / 17.8 inside; 22.8 / 30.2 / 22.8 outside). The derived span figures are not recomputed here; take spans from Wall_Framing.md. Exterior wall sheathing is finished (Oct 1). The W2/W4 west window openings are still solid sheathing (not cut out yet).
β BEFORE CUTTING ANY PHASE 3 LUMBER: every dimension that fills between members must be re-derived from the finished deck β golden rule 5, the deck is the reference. Absolute lengths stand (144 / 120 / 74 / 62Β½ / 30); everything between is +ΒΎ"β1" or cut in place. Door posts: inner faces at 28ΒΎ" and 91ΒΌ", which holds the door RO at 62Β½" β ignore the printed stations. Full rules: Lumber & Foundation Addendum.
Corner posts (74"): flush to deck corners. Toenails are hand-driven 16d HDG smooth — never the gun (Rule 6); two per face equals three gun nails. Drive from opposing faces so the drift cancels — blind-nailing is not a constraint on posts, because the interior liner skins the wall plane and covers a corner post on all four faces (two by sheathing outside, two by the liner inside). Heads here are never seen (p.22).
Bearing-wall top plates (4x4 Γ 144"): cut half-laps 3Β½ Γ 1ΒΎ, laps facing UP, rafter layout marked 24" o.c. facing up. Hand-drive loose 16d (3Β½") through the laps into the post tops β the lap is 1ΒΎ" thick and the bury is end grain, the one framing joint where the gun's 3" nail runs short; applies to all plate-to-post laps (bearing + gable, ~12 joints).
Gable top plates (4x4 Γ 120"): laps DOWN, drop onto the bearing-plate laps (p.23).
Center posts at 70Β³βββ" on center as-built (the plansβ nominal 72" assumes a 144" wall; ours measured 143β ", so the two bays are 66β " clear each); door posts with INNER faces at 28ΒΎ" and 91ΒΌ" β preserves the 62Β½" RO; ignore the printed stations (they assume 4" posts).
Temporary bracing (p.25) before anything else: 12' spreader between the two bearing walls, diagonals from posts to deck blocks on every wall. Plumb, square, then "walk-on-the-walls" solid. Stays up until the roof framing, deck and diagonals are on (the existing cross-wall restraint stays through the raise; remove all temporary bracing at Phase 5 step 12).
Infill framing β converted lengths: bearing-wall nailers 66ΒΎ" with top edge at 34β36"; rear nailer 113"; window framing to the current west-wall layout β full-height window studs, deck to plate (not 24Β½" cripples), centers at 25-3/4β³ / 61-1/4β³ / 82-5/8β³ / 118-1/8β³ from the south outside face (Sep 2; see Wall_Framing.md), with 34" sills and headers infilled between the studs at full 3Β½" depth (clear RO 34β³ wide; sill top and header bottom heights pending the final sash height and sill-pan profile β the older 48" / 67β " figures are to be checked); all four studs run full height and none dies into a brace. Aug 25 coordinates 21.34β22.84 / 56.84β58.34 / 85.53β87.03 / 121.03β122.53 and the 71" north stud are superseded.The plans' 66ΒΎ" window headers with bottom edge at 60Β½", and 24Β½" studs at inner faces 20ΒΎ"/45ΒΌ", are superseded. door blocking 21ΒΎ"; door header 62Β½" β 1x4 pine, ΒΎ" thick, not a 2x4 (p.24) β flat, tight under the plate.
Interior girts (added July 2026, not in plans): flat 2x4 rows square-nailed between posts β two rows around the full perimeter (top edges at ~24" and ~48"; the 48" row doubles as the seam landing for the future interior liner's horizontal joint) plus a third row in the two bench-wall bays so the pegboard zone has backing at 24" o.c. Do this NOW while the bays are open β retrofit toenailing after sheathing is miserable. What they buy: backing for the liner + pegboard, shelf/bracket nailers anywhere, and a stiffer sheathing field between the 72" posts. Skip girts where they'd cross the window/door ROs.
Angle braces (4x4, 30" long-point-to-long-point, 45Β°) β six per the plans: four on the blank bearing wall (the EAST wall β one per corner plus a pair meeting in a V at the center post) and two on the rear gable (NORTH), one per corner. Three 16d per end. Only AFTER temp bracing, and only on the two walls without openings (p.26, Figures 2–4). As-built there are eight β see the note below.
The seventh and eighth braces β as-built deviation, not an error to fix (25–26 Aug 2026). An extra 4x4 brace was installed by mistake at the NW corner of the WEST wall β a wall with windows, which the plans exclude. It was left in place deliberately, and once the 3″ window shift proved there was room, a matching brace was added at the SW corner (26 Aug) — a lone brace reads as something left in, a matched pair reads as design. Removing it would mean prying six 16d toenails out of a 4x4 at a plumbed corner, which risks racking the frame β the same mechanism that put 3/8" of rack into the plate box. And it is not harmful: the plans exclude braces from opening walls because in the stock design the siding provides those walls' shear and a corner diagonal would cross their 66" window headers. Our plywood sheathing shears every wall regardless, and our headers are only 34" and sit higher. The brace is redundancy, not a problem. Consequence: eight braces installed, six per the plans. The six came out of two 4x4x8' PT boards, so the west-wall brace spends a third β one additional 4x4x8' PT board, ~$16. The 72" girt row at that NW corner now runs as a ~12Β½" stub, the same as the braced corners on east and north.
Phase 4 β Sheathing, Roof & Dry-In
Plans p.27β30, 36, Appendix A Β· Materials: the Sep 30 re-order (originally Order 2) Β· ~2β4 days Β· ends at a safe pause point
CURRENT PLAN (Sep 30, 2026): asphalt over a sanded deck. Quantities, links and reasoning: Roof Phase Order. The old steps further down are kept for history, marked superseded.
Measure first: east and west plate outside faces apart (both ends + middle); wall sheathing height above the plate; laser-map the plate tops at all 14 rafter positions.
Test pair: rafter or speed square at 6:12. Plumb cut at the ridge; length along the top edge = (half the plate-to-plate distance β 0.75β³) Γ 1.118. Proven numbers (test pair fitted Oct 1): 66-1/4β³ top edge, plumb cut to plumb cut (about 68-1/4β³ overall, tip to tip). A 72β³ half-board is enough for one rafter. JCS end seat: plumb end against the sheathing, plus a level cut at 90Β° to it; proven: heel height 4-3/8β³, seat just under 3-1/2β³, no tail. Circular saw, no bevel; both end cuts are through-cuts, no notch. Fit it on the building with a 2Γ8 stand-in carrying real RR-R brackets: check the seats, the plumb faces and the ridge height, at both ends and the middle. Trial-fit an H2.5AZ and an A35Z. Record the numbers before batch cutting.(Done: all 14 are cut; one miscut is being replaced Oct 2.)
Batch-cut from the PATTERN rafter (always trace from it). Custom seats from the laser map: a shorter heel where the plate is high, a full-width shim where it's low; label each one. Don't cut the plates. The SW corner lap is ~ΒΌβ³ proud, so that end rafter gets a shorter heel.
Ridge: one 2Γ8Γ12 #2 Prime KD SYP board, cut 143-13/16β³, crown up. Layout every 24β³ on both faces (south edges at 0, 24, 48, 72, 96, 120, and the end β 1-1/2β³). RR-R connectors on the 10 interior rafter positions (attached after the trial assembly; done Oct 1); A35Z at the 4 ridge ends (the RR-R does not fit there). All with SD9112 screws. Ridge top is 34β³ above the plate top; ridge bottom 26-3/4β³. Cut the five collar ties after the rafters are up, marking them in place. Brace anchor blocks screwed into the joists. Cross-wall restraint stays.
Raise(planned Oct 2):temporary ridge props first β a 2Γ4 at 30-1/4β³ screwed to the inside face of each gable top plate at its center (60β³ from either outside corner), bottom flush with the plate bottom, with a scrap cleat on top, to carry the ridge. Then end rafters on one wall β ridge β opposite end rafters β plumb and string-straighten β tack a 2Γ4Γ14 diagonal at each end, ridge to floor β fill the pairs alternately, putting each rafter's H2.5AZ (A35Z at the ends) on as it's set, all with SD9112 screws, no nails β final plumb β fasten the diagonals fully.
Collar ties:(pattern & nailing) five cedar 1Γ6, marked in place, tight to the ridge (p.29). Grip-Rite 2β³ 13-ga stainless, 7 per end, pre-drilled near the ends. Sight across the rafter tops and plane any proud one.
Optional, before the deck and shingles: center-post rim supports(low priority; your call). The roof puts about 360 lb on each bearing-wall center post, and the rim under it is held by joist-end nails only (Structural assessment Β§11.6). One support under the rim directly below each center post (about 72β³ from either end, between the joists at 64β³ and 80β³), built like the skid stations: β measure the gap from the gravel to the rim bottom (the skid tops came in near 7-1/8β³, not 7-1/2β³); β‘ one solid 4Γ8Γ16 block bedded level in firm, tamped gravel, lengthwise along the rim, sunk as needed rather than trimming the wood; β’ aluminum termite shield on the block, 2β³ lip bent down 45Β°; β£ composite horseshoe shims on the shield, at least one full layer so no wood touches the aluminum (never cedar or pine shims); β€ a PT 4Γ4 offcut (or 4Γ6 flat), about 12β³ long, under the rim joist with its outside edge flush with the rim's outside face, inboard of the sheathing; β₯ shim snug to the rim bottom (a slip of paper won't pull out) β fill the gap, don't jack. East side: find the recorded oak-root edges first; if the root is right there, slide the support along the rim, staying between the 64β³ and 80β³ joists.
Deck: 19/32 sanded BCX, B face down, long side across the rafters. 7 sheets (6 + 1 spare; cancelled by Lowe's; Home Depot delivered Oct 2), 2 courses per slope; lower course first, with the end seam centered on the center rafter; 12 PSCL clips at the course seam (one per bay); β β³ gaps. Measure the upper course on site. 3β³ ring gun nails: 4β³ on sheet ends and gable rafters, 6β³ on the others, into rafters only. Chalk-line the rafter centers; pull any miss. Deck edges flush with the future shadow-board faces (~3-3/4β³ horizontal past the wall line or end rafter) β superseded.Deck edge β decided Oct 5, 2026: a finger's gap (~3/4β³) past the future shadow-board face at the eaves and the rakes, so the drip edge hangs free and drips clear of the trim. Overhang past the wall framing (eaves) or the end rafter's outer face (rakes), measured horizontally: O = plywood + band (~0.47β³) + fascia thickness + shadow board thickness + 3/4β³ β about 4-1/2β³ with the assumed 1-1/2β³ fascia and 1-3/4β³ shadow board. Measure a fascia board and a shadow board before cutting any deck. Then: A1 = R4 center (from the south framing face) + O β 1/16β³; A2 = 143-13/16β³ β R4 center + O β 1/16β³; eave gauge along the rafter, past its top corner = O Γ 1.118; rafter center marks from the deck's south edge = O + 3/4β³, then every 24β³, R7 at O + 143-1/16β³. Don't nail the overhangs. A temporary 2Γ4 toe board helps on the 6:12 slope.
Wall felt (later, after the roof): #30 organic felt, ASTM D226 Type II (or D4869 Type IV) per the CSSB, ~2 rolls, bought later from a roofing supply house. Fastened with the Stinger CH38-2 cap stapler; no seam tape (felt laps shed water). Leftover ProArmor strips form the bands behind the fascia. This replaces the housewrap step below.
ProArmor = DRY-IN: 3β³ course laps, 6β³ over the ridge from each side, Stinger cap staples in the extended-exposure pattern printed on the roll. Rakes wrapped over the deck edge and stapled underneath. Eaves: bottom 6β8β³ left loose, folded over the edge, for the drip edge later. Rated for 90 days of exposure; a tarp is only a backup.
Fascia bands + eave trim: leftover ProArmor bands on the east and west walls (bottom edge loose). Eave fascia + shadow board with the shadow board flush with the fascia top (not centered as JCS p.30 shows). At the eaves both tops sit at ~2-1/2β³ above the plate (open question: raise the fascia ~7/8β³, which shows less fascia); at the rakes both tops are tight under the deck. Fascia: 6 Γ cedar 2Γ8Γ12 (2 eaves + 4 rakes). Shadow boards: 2 Γ 2Γ4Γ12 + 4 Γ 2Γ4Γ8, rough green. All cedar is green: sticker it and cut joints after it settles. CAMO #8 Γ 3Β½β³ stainless trim screws. Eave corners flush (decided Oct 4, 2026): the eave fascia and shadow board both end at the gable plywood + band face (~144-3/4β³; measure the 12β² boards, center any shortfall or glue a cedar filler on the end), and the rake fascia and shadow run out over their ends, plumb-cut flush with the eave shadow face. No extra cedar. Details: Roof Deck & Edge Details.
Gable plywood + band, then the rake fascia + shadow board (same flush detail). North and south wall sheathing was cut back to mid-plate, so the gable plywood nails to the plate's upper half; the east and west sheathing projects ~1-3/4β³ above the plate. Decided Oct 4, 2026: three pieces per gable, not 10β³ strips. One middle pentagon under the peak plus two corner pieces, 15/32 Plytanium to match the walls (not the 19/32 deck spare). The vent lands in the solid middle piece, and each gable has two seams instead of about eleven.
South gable: seams line up with the door opening, 28-3/4β³ and 91-1/4β³ from the corners. Middle piece 62-1/2β³ wide, about 20-1/2β³ tall at its sides and 35-3/4β³ at the peak; corner pieces 28-3/4β³ wide, about 6β³ tall at the corner and 20-1/2β³ at the seam (heights from mid-plate to the rafter tops). North gable: mirror the south layout.
Stock: all three pieces fit on one 4Γ8 laid horizontally, so one sheet per gable: leftovers if big enough, otherwise 2 sheets. If Lowe's cuts a sheet down for the car, keep one piece at least 63β³ Γ 36β³ for the middle.
Cut and fit: tack each piece up oversize, scribe the sloped edges against the actual end rafters, take it down and cut.
Nail 6β³ o.c. along the plate and both end rafters, ~3/8β³ in from the edges. At the end rafters, check that a 2β³ nail doesn't poke through the inside face (15/32 + 1-1/2β³ rafter); if it does, angle them or use 1-3/4β³.
Seams: 1/8β³ gap, no backing. Optional: one 15/32 panel clip at mid-height of each seam to keep the edges flush. Keep shingle nails a little off the seams.
Vent: cut in the two screened gable vents in the middle pieces after the gable plywood, at least 4β6β³ clear of the plate and rafter nailing (model chosen later; flange nailed through, JCS p.34).
Drip edge: at the eaves, under the loose ProArmor strip, then staple the strip back down over the flange; at the rakes, over the underlayment.
Scrap test, then shingles. Test: 3/4β³ coil nails through shingle scraps into a deck offcut; no tips on the back. Starter cut from 3-tab: tabs off, adhesive at the eave edge, ΒΌβΒΎβ³ past the drip edge, first piece trimmed 6β³. Field: 6 nails per shingle, flush. Loctite under each rake shingle end. Cut ridge caps at 5β³ exposure; seal the last cap's nail heads.
β Pause point β dry-in after the ProArmor step (deck + ProArmor on; the wall felt comes later).
PreβSeptember-30 plan below, kept for history. Where it conflicts with the current plan, the current plan governs.
Sequence matters here: β sheathe bearing walls BEFORE rafters (they butt against the ply) Β· β‘ fascia BEFORE metal roofing Β· β’ test rafter pair BEFORE batch-cutting Β· β£ window sill pans + rough-opening flashing BEFORE the wall felt (they cannot be added afterward without cutting the felt) β the pan design is open (see below). (β‘ and the housewrap order are superseded by the current plan above; β’ is done; β£ still stands.)
Sheet seams β there is no seam blocking. Real panels measure 47.76" Γ 95.76" (to be re-checked against the sheets on site), not 48 Γ 96, so blocking laid out on a 48" module never backed a seam. Studs were placed at the actual panel lines instead β east at ~48β³ and ~95-7/8β³ (Sep 1β2; 47.76" and 95.52" superseded, they omitted the 1/8β³ panel gaps), and on the window studs and door posts elsewhere. Lay every seam out from a measured panel, never from 48/96.
Sheathe the two bearing walls: Β½" ply, top edge running 1ΒΎ" above the top plate (rafters butt against it β replaces the plans' proud siding, p.27β28), bottom lapping the rim. Exterior wall sheathing is 12 sheets as-built, not 11 β the 3" west-window move (Phase 3) cost one sheet.
[SUPERSEDED Sep 30, 2026 β see the current plan above]Rafter layout with a speed square (NOT the paper templates β they assume full-dimension stock): 26.5Β° plumb cut (6/12), original 66β " reference only (not a verified nominal-lumber cut length), JCS end-seat geometry per the original seat template (PDF p.43): level bearing surface at the end, plumb end against raised wall sheathing, no projecting rafter tail. The previous fixed seat-depth rule is withdrawn; derive the dimensions from the actual assembly. Cut ONE TEST PAIR, stand it with a ridge offcut sandwiched at the peak, adjust, then that pair is the pattern for all 14.
[SUPERSEDED Sep 30, 2026 β see the current plan above]Set rafters (p.28): cedar ridge 1x8 Γ 144" (full 12' board, uncut) crowned with 24" layout on both faces; end pairs first, ridge end-nailed with 3" STAINLESS ring, 3 per rafter; fill alternating front/back to keep the ridge straight; plumb by sighting; temp brace ridge to floor (kept below rafter tops). Hurricane tie at every rafter's plate seat β spruce is untreated and holds a toenail worse than PT.
[SUPERSEDED Sep 30, 2026 β see the current plan above]Collar ties β five, cedar 1x6, tight to the ridge, cut angles in place (p.29). 6d stainless ring, 7 per rafter (plans say 5; cedar gives ~53% of SYP's nail capacity, and the heads show).
Gable-wall sheathing cut flush to the rafters (p.29).Superseded Oct 1, 2026: the north and south sheathing is cut back to mid-plate and the gable plywood (three pieces per gable, decided Oct 4) nails to the plate's upper half (current plan step 9).
[SUPERSEDED Sep 30, 2026 β see the current plan above]Roof strapping β cedar 1x4, KILN-DRIED 3/4" @ ~20β24" o.c., top course held 2" below the ridge; fastened with #8Γ2" stainless screws, 2 per rafter; straightedge at the eaves so nothing hangs past the siding plane (p.29).
[SUPERSEDED Sep 30, 2026 β see the current plan above]Fascia (2x8) + shadow board (2x4) (p.30) β run a straightedge along the strapping to confirm the roofing will clear the trim.
[SUPERSEDED Sep 30, 2026 β see the current plan above]Metal roofing (p.36): first panel sets the whole layout β take time squaring it; 2" overhang past the shadow board; 1" stainless screws in the flats, 2" in the ribs for the cap. β Screw pattern is REQUIRED β field ~12" apart, ~6" within 3 ft of the eave, either rake, or the ridge. On 3/4" KD cedar that doubled edge pattern is the uplift margin, not a bonus. Full spec in Nail_Guns_and_Fasteners.html. Dial the driver back; cedar strips easily.
Window rough-opening flashing(window construction β sill/pan, stops β is not finalized (open); see Window_Install_and_Drainage.html; the sash are fixed and service-removable, not hinged) β BEFORE the wall felt (absent from the Vermont-oriented plans, which assume board siding; full write-up in Wall_Framing.html under "Windows and weather β the rough openings"). The shingle rule: every layer laps over the one below it, so water can only ever run down and out. Order: β sill pan onto bare framing β first, before the window Β· β‘ window set in, sitting on the pan Β· β’ jamb flashing laps over the pan's end dams Β· β£ head flashing laps over the jamb flashing Β· β€ the wall felt laps over the head flashing. Do it in the wrong order and you have built a funnel. Since the sashes go in at Phase 5 (step p5-4), the pan and the jamb/head flashing were to be built into the bare opening, with the sash dropping onto a pan that is already there (pan details open). Two details: slope the sill β the rough sill at 48" is a full 3Β½" member sitting flat, so bevel it or slip a tapered shim under the front and let gravity drain it instead of surface tension; and the corners are where these fail β tape does not fold cleanly into an inside corner, so use pre-formed corner patches or cut a slit and overlap, always with the outer piece on top. ~$25 for a roll of 4β6" self-adhered flashing tape.
[SUPERSEDED Sep 30, 2026 β see the current plan above]Housewrap the walls (cap staples) β makes the building fully weathertight while shingles wait. Lap the wrap OVER the window head flashing, never under it. Seam tape (~$18) is optional β cap nails hold the wrap on but do not seal the laps. (Superseded Oct 1: #30 felt, Stinger cap stapler, no seam tape; see the wall felt step above.)
β Pause point β dry-in. Everything left is finish work under a roof.(Current pause point: deck + ProArmor, after the ProArmor step of the current plan.)
Bottom edge: tape, felt and shingle starter β 17 September 2026
This modified detail supersedes the earlier ΒΌβ³ shingle overhang. JCS p.27 specifies a ΒΌβ³ overhang for its original board siding, not for this added plywood/felt/shingle assembly. No metal bottom flashing is planned. Gravel and projecting shingles reduce splash but do not replace ground clearance or drainage.
Plywood: bottom approximately flush with the rim bottom. The packing height of 85.47β³ does not include an additional ΒΌβ³ underhang; field-check the top and bottom references before cutting.
Fasten first, tape second: complete required plywood-to-rim fastening before applying tape. Do not omit or relocate structural sheathing nails to keep the tape unpunctured. Cover the flush lower nail heads with the tape.
Tape: on clean, dry wood, run an adhered strip along the exterior bottom face and tightly around the exposed plywood edge, returning a short distance onto the rim underside. Aim for approximately 3β³ of tape up the exterior face, with the remainder forming the edge/underside return; select a width that accommodates the actual corner. Roll firmly; no loose pockets. Do not enclose the whole rim or floor in membrane. This is a proposed project edge-protection detail, not a manufacturer-published complete assembly.
Felt: lap down over the tape's upper edge so drainage stays outside it. Leave the bottom drainage outlet open; do not caulk the shingle bottoms to the tape or tuck felt underneath to form a trough. Keep subsequent felt fasteners above the taped band where the WRB fastening instructions permit.
Starter: double the bottom course, offsetting joints at least 1Β½β³. Set the visible layer 1β³ below the plywood bottom and the underlying layer Β½β³ below it. These are vertical overhangs, not horizontal projections.
Shingle nail line: approximately 1β³ above the butt of the next course. With 7β³ exposure and 1β³ bottom overhang, the next course begins 6β³ above the plywood bottom and the visible starter nails sit approximately 7β³ above it. Thus a 3β³-high taped band remains approximately 4β³ below those nails. Keep undercourse fasteners above the tape too, in locations concealed by the following shingles.
Exposure is not finalized: 7β³ is a layout example, not permission to use that exposure with any 16β³ shingle. Confirm species, grade and product instructions. Nail height above plywood bottom = exposure + 1β³ β overhang. Check this against the actual tape top before shingling; do not move nails out of the prescribed shingle nailing zone just to avoid tape.
Protection: tape is not a permanent exposed finish. VYCOR Plus is a candidate compatible with plywood and PT wood, requiring clean, dry substrates and covering within its published 30-day exposure limit. Protect it from permanent sunlight, including at the lower return; if that cannot be achieved, select a product approved for the actual exposure.
Plans p.31β35, Appendix B Β· Materials: Order 3 + wall felt, wall-shingle nails, windows/vents (later) Β· ~4β6 days
Cedar shingles over the #30 felt: doubled starter with the visible layer 1β³ below the plywood bottom and underlying layer Β½β³ below it. Confirm exposure and keyway spacing from the actual grade/product; the former blanket 7β7Β½β³ exposure is not finalized. See bottom-edge tape, starter and nail-line detail.
Corner boards + window/door trim (p.31): 1x4 corners and 1x4 window/door casing nailed in pairs (no "bullet-hole" look); 1x5 door jamb trim; 1x3 window stops; 1x2 door stops. Shingles die into the trim.
Vents in the gable (p.34) β two screened gable vents, model chosen later: trace, cut siding, nail through flange, 1x2 trim piece under it.
Windows AFTER the roof is done (p.31 note β prevents breakage): hinged at top, open out and up, held 3" in, hook + eyes to prop open (p.32) β superseded: the sash are fixed and service-removable, not hinged (no hinges, hooks or eyes). Window construction (sill/pan, stops) is not finalized (open), and the sash still need rehab (see Window_Restoration); follow Window_Install_and_Drainage.html. The W2/W4 openings are still solid sheathing and must be cut out first.
Build the doors (Appendix B, modified for sash lites): vertical boards + two cross battens + diagonal, screws ΒΎβ1" from edges; finished width 5/8" less than the opening β measured from the actual building. 1Β½" thick from ΒΎ" stock is fine (5/4 face layer if bought). Lite layout: top batten high (within a few inches of door top), diagonal kept in the lower two-thirds, leaving the upper-middle clear for the sash.
Set a 6-light sash in each leaf: mark the cutout = sash outside frame + β " play, centered on leaf width, sash top ~8β12" below door top; plunge-cut with circular saw, jigsaw the corners, cuts β₯2" clear of battens/diagonal. Screw + glue a 1x3 ring to the interior face overlapping the cut edges ~1" (re-ties the severed boards; doubles as the stop). Prime/paint all cut edges. Bed the sash from outside in sealant against the ring; 1x2 exterior stops with stainless brads; bottom stop is a sloped sill piece with a drip kerf β the detail that keeps the lite from rotting its opening.
Hang doors (p.32): tight to top + hinge side, top hinge down 12", bottom hinge up 14"; stops installed with door closed; turn latch, foot bolt (chisel clearance), chain bolt (flip the bolt angle per p.32).
Paint scheme (decided July 2026): accent color on the doors + all four sash + the pine door/window stops (audit F5 β stops frame the painted sash, so they paint with it) + optionally the gable vent β paint sash and stops on sawhorses BEFORE glazing/hanging. All cedar trim stays natural (silvers with the shingles; that was the point of buying cedar). (Sep 30 note: the roof is now Weathered Gray shingles; pick the accent against that.)
Ramp (p.33): stringers toenailed to the rim below the door; needs ~5' of level ground in front of the door.
Paint the floor (decided July 2026): porch & floor enamel, 2 coats rolled over the swept 3/4" ply β before anything moves in. The ply is PT (July order): verify it's dry first β sprinkle-test (water beads = wait, soaks in = paint); fresh treated stock can need weeks. The floor going down in August and enamel landing at Phase 5 end should provide that gap naturally, but test, don't assume. Seals splinters, sweepable, recoat-able forever; no adhesive to fail in an unconditioned building (peel-and-stick tile was considered and rejected for exactly that). ~$50/gal.
Interior liner + pegboard (decided July 2026; timing flexible β any weekend after dry-in): 15/32 Plytanium sheathing (actual 0.451") recessed into the bays on the ripped 2ΒΎ" girts, so the liner sits 0.30" behind the post faces and the frame stays exposed. This is what hides the ~1,500 shingle-nail points in the bays β The shingle nails stay full-spec 1ΒΎ"; do not shorten them for cosmetics is superseded: wall shingles use stainless ring-shank coil roofing nails from the Freeman roofing nailer, 1-1/4β³β1-1/2β³ (final length open; the CSSB minimum for single-course 16β³ shingles is 1ΒΌβ³, and 1ΒΎβ³ is its double-course figure). Pegboard (tempered or metal, never untempered) over the bench-wall bays on the tripled girts β the open cavity between girts is the hook standoff. Everything else gets plain ply: screw-anywhere walls.
Remove ALL temporary bracing (only now). Stone the fence-side slot, clear of leaves, and keep it that way (airflow + termite visibility).
Dry-laid fieldstone skirt β outside face of the 4x6 wall only (Appendix C's own recommendation, p.47, using the excavation stones). No stone inside the perimeter: the 12" gravel margin stays open β it's the airflow moat, the termite sightline, and the eave drip line's landing zone (roof water β margin β tub β SW drain). First course on a few inches of compacted gravel, slight lean back against the timbers, stone top at or below the timber top. Musts: frame around the SW drain grate (never bury it β it's the cleanout); as-built photo map (rebar, conduit cap, drain penetrations) complete BEFORE the first stone β the skirt hides the wall forever. Expect to re-seat a stone or two after the first wet seasons; that's dry stone working, not failing.
The plans' "2x6" is a true 2"Γ6"; store lumber is Β½" smaller each way (2x6 β 1Β½"Γ5Β½", 4x4 β 3Β½"Γ3Β½", 1x boards β ΒΎ" thick). The design tolerates this fine β if you follow five rules:
Never batch-cut the cut list up front. Primary members to printed lengths; every infill piece measured in place.
Hold the ROs, not the printed stations. Door 62Β½"Γ73"; windows 34" clear width (the 19β " height and the 48" / 67β " sill and header edges are as-built figures to be re-checked against Wall_Framing.md) β the salvage barn sash (33.5"Γ19.125") plus the plans' own sash-plus-Β½" rule for sash in hand, which supersedes the plans' 24Β½"Γ24Β½". Register the RO-forming faces/edges (incl. bearing-wall nailer TOP at 36", and the window sill TOP at 48" / header BOTTOM at 67β ") and let far edges land where thinner stock puts them. RO Β±ΒΌ" is fine (p.31). Finished door opening moves too: the plans' 60Β½"Γ72" assumes a full 1"-thick 1x5 jamb; our ΒΎ" stock gives ~61" Γ ~72Β½". Build the doors to the measured opening, plus the plans' 5/8" gap.
The deck is the reference: exactly 120"Γ144", diagonals 187Β½". When a printed number and your tape disagree, the tape wins.
Part (qty)
Plans say
Cut instead
Why
Floor joists (10 @ 16" o.c.)
116Β½"
117"
rims 1Β½" thick, not 1ΒΎ"
Floor blocking
20β / 21β "
cut to fit (~14Β½" @16" o.c.)
joists 1Β½", not 2"
Bearing-wall nailers (4)
66"
66ΒΎ"
posts 3Β½" wide, not 4"
Window headers (2)
66"
66ΒΎ"
same
Rear gable nailer (1)
112"
113"
corner posts Β½" narrower each
Door blocking / front nailers (4)
20ΒΎ"
21ΒΎ"
corner + door posts narrower
Window studs (4)
24Β½" cripples, inner faces 20ΒΎ"/45ΒΌ"
full height, deck to plate β west wall centers at 25-3/4β³ / 61-1/4β³ / 82-5/8β³ / 118-1/8β³ from the south outside face (Sep 2; Aug 25 numbers and the 71" north stud superseded); 34" sill + header infilled between them, full 3Β½" depth
clear RO is 34β³ wide for the salvage sash (heights pending sash height and sill-pan profile) β the plans' 24Β½"Γ24Β½" window is superseded
Door posts (2)
stations 24ΒΎβ28ΒΎ / 91ΒΌβ95ΒΌ
74" β inner faces at 28ΒΎ" / 91ΒΌ"
hold the RO
Top-plate half-laps
4" Γ 2"
3Β½" Γ 1ΒΎ"
match actual stock
Rafters (14)
trace templates
speed-square layout + test pair β KD SPRUCE (Aug 2026)KD Southern Yellow Pine (Sep 2026), not PT or cedar
templates assume 6" depth, 1" ridge; green cedar checks/twists, disqualifying for these cuts
Siding/trim lengths
(printed)
run wild, cut in place
plans' own advice
Knock-Ons & Structure
Wall height is 77Β½", not 78" (3Β½" plate on 74" posts). Heights above the plate all drop Β½" β measure the building, not the drawings.
Door RO height lands ~73ΒΌ" (ΒΎ" header) β harmless; doors built to fit.
Strength: nominal 2x6 β 63% bending strength / 58% stiffness of true 2x6 β offset by stronger SYP species and short spans. The floor at 16" o.c. recovers ~full design intent (63% Γ 1.5 β 94%). Roof and posts: see Structural_Load_and_Connection_Assessment Β§11 (the roof now weighs about 1,160 lb installed per the Oct 1 takeoff, replacing the earlier ~1,040 lb; center-post dead load β 360 lb, about 550 lb with snow).
Doors: ΒΎ" stock builds a 1Β½"-thick door vs. JCS's 2" β functionally fine; 5/4 face layer if you want heft.
Failure-mode math: with these rules, the worst realistic miss is one $10 board cut to a printed number instead of a measured one β not a corner you can't get out of.